CONTACT

Do you need individual advice or further product documentation?

Please contact us.
We will be happy to inform you at any time – even on site.

Contact
Mobile - Existing tunnel
Desktop - Existing tunnel
din-Anlagentechnik - Praxisbeispiele - TUBE BK Retrofit
din-Anlagentechnik - Praxisbeispiele - TUBE BK
din-Anlagentechnik - Category - TUBE BK Retrofit

TUBE BK Retrofit

Handrail-luminaire replacement

din-Anlagentechnik - Category - TUBE BK

TUBE BK

Illumination of niches

Retrofit and retool security lighting of existing tunnel

An investment for the future.

Save 60-80% on energy and maintenance costs by converting to LED compared to conventional fluorescent tubes. The use of the latest LED-technology optimises the illumination of escape routes while at the same time minimising glare. We will be happy to advice you on your possibilities for specific projects.

 

Excerpt from our references

Convincing solutions. Excellent references.

Sonnsteintunnel

Altmünster, Upper Austria

In the Sonnsteintunnel of the Salzkammergutbahn in 2010, we equipped the escape and rescue tunnel with an illuminated handrail with orientation lighting in accordance with ÖBB regulations. The tunnel in the sandstone hewn by  mining posed special requirements to the wall fastening, some of which had large wall clearings.

Rekawinklertunnel & Dürrebergtunnel

St. Pölten, Austria

In the course of the general renovation by ÖBB in 2016/2017, we were allowed to equip two visually appealing tunnels with historic sandstone portals with a new handrail with orientation lighting – Rekawinkler Tunnel 308m, Kleiner Dürrebergtunnel 248m.

Türkenschanztunnel

Vienna, Austria

Directly below the Türkenschanzpark, in the 18th district of Vienna, we renewed the handrail with orientation lighting in the Große Türkenschanztunnel 705m in 2017 in the course of the general renovation by ÖBB.

Tauerntunnel

Mallnitz, Austria

One of the longest ÖBB railway tunnels with the length of 8371m was renovated in the course of 2018 in the niche lighting area in order to meet the required illumination values.

Pettenbachtunnel

Semmering, Austria

The handrail orientation lighting of the 186m long Pettenbachtunnel was renovated in 2016 in cooperation with the responsible ÖBB ASC.

Klausentunnel

Reutte, Austria

In 2017/2018 the 513m long Klausentunnel was newly electrified and the existing handrail was renewed by us with orientation lighting. A standard compliant illumination of the escape route is thereby guaranteed again.

Bergiseltunnel

Innsbruck, Austria

The 662m long Bergiseltunnel was newly electrified in 2018 and in the course of this the handrail was renewed by us with orientation lighting. A standard compliant illumination of the escape route is thereby guaranteed again.